Vancouver, British Columbia, November 23, 2021: Nevada Sunrise Gold Corp. (“Nevada Sunrise”, or the “Company”) (TSXV: NEV) is pleased to announce that its joint venture partner, New Placer Dome Gold Corp. (“New Placer Dome”) (TSXV: NGLD) has completed the first half of the 2021 induced polarization (IP)/resistivity geophysical surveys currently underway at the Kinsley Mountain Gold Project (“Kinsley Mountain”) in Nevada. Nevada Sunrise holds a 20.01% interest in the Kinsley Mountain joint venture, with New Placer Dome, as operator, holding a 79.99% interest.
The first phase of the 2021 IP/resistivity geophysical surveys infilled the area between the Western Flank Zone (“WFZ”) and Shale Saddle 2020 survey grids. There is a correlation between enhanced chargeability and drill-confirmed high-grade gold sulphide mineralization at the WFZ. At Shale Saddle, anomalous gold values were discovered on the periphery of a 500 by 250 metre untested chargeability anomaly.
Figure 1. Northeast-facing isometric view of the Kinsley Mountain Gold Project showing the 2020 and 2021 IP/resistivity survey chargeability inversions.
Seven lines, totaling 30 line-kilometres, were completed during the first phase of surveying, extending the existing 2020 Shale Saddle grid north to connect and overlap with the south end of the WFZ grid (see Figure 1). Chargeability anomalies were detected on all lines, coincident with modelled Secret
Canyon shale rocks, the main host of high-grade sulphide gold mineralization at the WFZ and Secret Spot. Drilling in 2020 by the Kinsley Mountain joint venture yielded high-grade gold sulphide intercepts from the Secret Canyon shale including: 10.2 g/t gold (Au) over 6.1 metres within a broader zone averaging 2.63 g/t Au over 38.1 metres in KMR20-017 at the WFZ; and 11.3 g/t Au over 2.9 metres within a broader zone grading 3.81 g/t Au over 11.6 metres in KMD20-006 at Secret Spot (see Nevada Sunrise news releases dated January 1, 2021 and April 28, 2021). Significantly, the two holes are separated by a 1.5 kilometer expanse of largely untested Secret Canyon stratigraphy.
The new chargeability anomalies occur within areas untested by previous drilling, with each line producing one or more potential drill targets. Several anomalies are spatially associated with major fault structures including the Kinsley NW Fault and the Transverse Fault, which correlate to WFZ and Secret Spot gold mineralization, respectively. Together with anomalies identified by the 2020 Shale Saddle survey, a broad north-south trending zone of elevated chargeability has been delineated over a strike length of 1.5 kilometres.
New Placer Dome reports that the next phase of surveying currently underway extends the 2020 WFZ grid to the east, covering the Upper Kinsley Ridge pits and Notch Peak breccias. Two lines, totaling 5 line-kilometres, are planned for the WFZ grid extension. An additional 45 line-kilometres are planned for the underexplored Kinsley North Range, covering a total area of 25 square kilometres of undrilled target host rocks.
Methodology and QA/QC
Seven IP/resistivity lines have been completed to date during 2021 infilling the area between the WFZ and Shale Saddle target. The lines are spaced 150 metres apart, with line lengths ranging from 3.6 to 4.0 kilometres. Data were collected using the Direct Current Resistivity, Induced Polarization (“DCIP”) method, on a 16-channel pole-dipole array with a dipole size (a-spacing) of 100 metres. A GDD GRx16 receiver and GDD 5000W-2400V-20A IP Tx model Tx4 transmitter was used. Raw data were loaded into GDD IP Post-Process software and Geosoft Oasis Montaj software for quality control and review. The reviewed data were used to produce pseudo section plots of apparent resistivity and apparent chargeability and were the input for the inversion. Inversions were completed using the UBC-GIF DCIP2D inversion codes. Each line of data was inverted independently. The resistivity and IP inversion is a two-step process. The resistivity inversion is run first, and this model is used in the chargeability inversion. Multiple inversions were completed for quality control.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Robert M. Allender, Jr., CPG, RG, SME and a Qualified Person for Nevada Sunrise as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Allender has examined the information provided by New Placer Dome, which includes the data disclosed underlying the information and opinions contained herein.
About Nevada Sunrise
Nevada Sunrise is a junior mineral exploration company with a strong technical team based in Vancouver, BC, Canada, that holds interests in gold, copper, cobalt and lithium exploration projects located in the State of Nevada, USA.
The Company’s key gold asset is a 20.01% interest in a joint venture with New Placer Dome Gold Corp. (TSXV: NGLD) at the Kinsley Mountain Gold Project near Wendover, NV. Kinsley Mountain is a Carlin-style gold project hosting a National Instrument 43-101 compliant gold resource consisting of 418,000 indicated ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred ounces of gold averaging 1.51 g/t Au (2.44 million tonnes), at cut-off grades ranging from 0.2 to 2.0 g/t Au 1.
1 Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021 with an effective date of May 5, 2021 and prepared by Michael M. Gustin, Ph.D., and Gary L. Simmons, MMSA and filed under New Placer Dome Gold Corp.’s Issuer Profile on SEDAR (www.sedar.com).
Nevada Sunrise has right to earn a 100% interest in the Coronado VMS Project, located approximately 48 kilometers (30 miles) southeast of Winnemucca, NV. The Company owns a 15% interest in the historic Lovelock Cobalt Mine and the Treasure Box copper properties, each located approximately 150 kilometers (100 miles) east of Reno, NV, with Global Energy Metals Corp. (TSXV: GEMC) holding an 85% participating interest.
Nevada Sunrise owns 100% interests in the Jackson Wash and Gemini lithium projects, both of which are located in Esmeralda County, NV. The Company owns Nevada water right Permit 44411, located within the Clayton Valley basin near Silver Peak, NV, which is currently subject to a purchase and sale agreement with Cypress Development Corp., and water permit 86863, located in the Lida Valley basin, near Lida, NV.
For Further Information Contact:
Warren Stanyer
President and Chief Executive Officer
Telephone: (604) 428-8028 Facsimile: (604) 684-9365 email: warrenstanyer@nevadasunrise.ca
FORWARD LOOKING STATEMENTS
This release may contain forward‐looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur and include disclosure of anticipated exploration activities. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward‐looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forwardlooking statements whether as a result of new information, future events or otherwise.
Such factors include, among others, risks related to the interpretation and actual results of historical production at Kinsley Mountain, reliance on technical information provided by third parties on any of our exploration properties, including access to historical information on the Kinsley Mountain property as well as specific historical data associated with drill results from the property, technical information received from New Placer Dome Gold Corp., current exploration and development activities; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; failure of New Placer Dome Gold Corp. to complete anticipated work programs; labor disputes and other risks of the mining industry; delays due to pandemic; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Management Discussion and Analysis for the Nine Months ended June 30, 2021, which is available under Company’s SEDAR profile at www.sedar.com.
Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Nevada Sunrise disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The securities of Nevada Sunrise Gold Corporation have not been registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States or to the account or benefit of any U.S. person.